U.S. Department of Energy Combined Heat and Power
and Microgrid Installation Databases

Add a Microgrid Site

Microgrid Installations in California

More detailed data files with additional information are available on the Data Download page.
Organization Name Project Name City Op Year Latest Install Year Primary Application Grid Connected Microgrid Type Generation Capacity (kW) Storage Capacity (kW) Technologies Last Verified
Pacific Union College Pacific Union College Angwin 2005 2006 College / University Yes Continuous 1,500.0 0.0 CHP 2021
Anza Electric Cooperative Anza Electric Cooperative Anza 2019 2019 City / Community Yes Conditional 4,400.0 2,000.0 Solar, Storage 2021
Cal Poly Humboldt Cal Poly Humboldt (Formerly Humboldt State University) Arcata College / University Yes Continuous 1,070.0 0.0 CHP, Solar
Bloom Energy Manufacturing Facility Microgrid Bakersfield 2018 2018 Commercial Yes Continuous 500.0 0.0 Fuel Cell 2024
WattEV WattEV Electric Truck Stop Microgrid Bakersfield 2024 2024 Commercial Yes Conditional 5,000.0 0.0 Solar, Storage 2024
Blue Lake Rancheria Tribe Blue Lake Rancheria Tribe Microgrid Blue Lake Rancheria 2017 2017 City / Community Yes Continuous 1,595.0 1,150.0 Diesel, Fuel Cell, Solar, Storage 2024
SDG&E Borrego Springs Microgrid Borrego Springs 2013 2022 City / Community Yes Conditional 29,850.0 1,500.0 Diesel, Fuel Cell, Solar, Storage 2024
Pacific Gas & Electric Briceburg Microgrid Briceburg 2021 2021 City / Community No Continuous 71.5 27.2 Natural Gas, Solar, Storage 2021
Haley Brothers Haley Brothers Buena Park Commercial Yes Conditional 45.0 30.0 Solar, Storage 2021
Morongo Casino Resort and Spa Morongo Casino Resort and Spa Cabazon 2004 2004 Commercial No Continuous 14,000.0 0.0 CHP, Diesel 2021
Castello Di Amorosa Castello Di Amorosa Winery Calistoga 2022 2022 Commercial Yes Conditional 375.0 250.0 Solar, Storage 2022
Boys & Girls Club of America Boys & Girls Clubs of St Helena and Calistoga Calistoga 2023 2023 City / Community Yes Conditional 33.0 80.0 Solar, Storage 2023
U.S. Military Camp Pendleton Camp Pendleton North 2019 2019 Military Yes Continuous 565.0 375.0 Diesel, Solar, Storage 2019
Bloom Energy Sporting Facility Microgrid Carlsbad 2013 2013 Commercial Yes Continuous 300.0 0.0 Fuel Cell 2024
WS Display WS Display / San Diego Sign Company Carlsbad 2021 2021 Commercial Yes Conditional 482.0 250.0 Solar, Storage 2021
Bloom Energy Lab Microgrid Carlsbad 2020 2020 Commercial Yes Continuous 1,000.0 0.0 Fuel Cell 2024
WS Display / San Diego Sign Company WS Display Microgrid Carlsband 2021 2021 Commercial Yes Conditional 482.4 250.0 Solar, Storage 2022
Southern California Edison Catalina Island Catalina Island 2012 2012 City / Community No Continuous 5,000.0 1,000.0 Diesel, Storage 2024
Sierra Nevada Sierra Nevada Brewing Chico 2016 2016 Commercial Yes Continuous 4,000.0 500.0 CHP, Solar, Storage 2021
Inland Empire Utilities Agency Inland Empire Utilities Agency Battery Storage Microgrid Project Chino 2016 2016 Water Treatment / Utility Yes Continuous 9,800.0 3,650.0 CHP, Diesel, Solar, Storage, Wind 2021
Bosch American Honda Motor DC Microgrid Chino 2018 2018 Commercial Yes Conditional 1,300.0 0.0 Solar, Storage 2024
Gridscape Solutions, Industria Power Imperial Western Products (IWP) Coachella 2023 2023 Commercial Yes Conditional 846.0 0.0 Solar, Storage 2023
Colusa Indian Community Colusa Casino and Indian Community Microgrid Colusa 2005 2017 City / Community No Continuous 9,100.0 4,000.0 CHP, Diesel, Solar, Storage 2024
Bloom Energy Manufacturing Facility Microgrid Compton 2011 2011 Commercial Yes Continuous 400.0 0.0 Fuel Cell 2024
Container Solutions Container Solutions Concord 2019 2019 Commercial No Conditional 35.0 0.0 Natural Gas, Solar, Storage 2020
John Muir Medical Center John Muir Medical Center Concord 2010 2010 Hospital / Healthcare Yes Continuous 900.0 0.0 CHP 2021
U.S. Military Military Ocean Terminal Concord Concord Military Yes Continuous 33.5 0.0 Wind 2023
Bloom Energy Office Building Microgrid Cupertino 2017 2014 Commercial Yes Continuous 4,000.0 0.0 Fuel Cell 2024
Bloom Energy Grocery Store Microgrid Davis 2020 2020 Commercial Yes Continuous 200.0 0.0 Fuel Cell 2024
Southern California Gas Company [H2] Innovation Experience Demonstration Project Downey 2023 2023 City / Community Yes Continuous 24.5 30.0 Fuel Cell, Solar, Storage 2023
Alameda County Alameda County’s Santa Rita Jail Microgrid, Dublin Dublin 2012 2016 Public Institution Yes Continuous 5,115.0 2,000.0 CHP, Diesel, Solar, Storage, Wind 2024
Las Positas Community College Chabot-Las Positas Community College Microgrid Dublin 2018 2018 College / University Yes Conditional 2,350.0 200.0 Solar, Storage 2023
City of Dublin Dublin Wave Waterpark Dublin 2023 2023 Commercial Yes Conditional 525.0 250.0 Solar, Storage 2023
City of Dublin Dublin Corporation Yard Dublin 2023 2023 Commercial Yes Conditional 47.0 125.0 Solar, Storage 2023
City of Dublin City of Dublin Senior Center Dublin 2023 2023 Hospital / Healthcare Yes Conditional 38.0 125.0 Solar, Storage 2023
Bloom Energy Grocery Store Microgrid El Dorado Hills 2020 2020 Commercial Yes Continuous 250.0 0.0 Fuel Cell 2024
Arcata Airport / U.S. Coast Guard Station Redwood Coast Airport Microgrid Eureka 2022 2022 Airport Yes Conditional 2,200.0 2,300.0 Solar, Storage 2023
Bloom Energy Food & Beverage Facility Microgrid Fairfield 2024 2024 Commercial Yes Continuous 250.0 0.0 Fuel Cell 2024
Bloom Energy Office Building Microgrid Folsom 2014 2014 Commercial Yes Continuous 750.0 0.0 Fuel Cell 2024
Gridscape Solution Fremont Fire Station #11 Fremont 2019 2019 Public Institution Yes Conditional 38.4 20.0 Solar, Storage 2020
Bloom Energy Lab Microgrid Fremont 2020 2020 Commercial Yes Continuous 1,250.0 0.0 Fuel Cell 2024
City of Fremont Fremont Fire Station #7 Fremont 2019 2019 Public Institution Yes Conditional 43.2 20.0 Solar, Storage 2020
City of Fremont Fremont Fire Station #6 Fremont 2019 2019 Public Institution Yes Conditional 43.2 20.0 Solar, Storage 2020
Valley Wide Beverage Valley Wide Beverage Fresno Commercial Yes Conditional 1,500.0 125.0 Solar, Storage 2023
Prologis Prologis Denker Microgrid Gardena 2024 2024 Commercial Yes Continuous 2,750.0 0.0 Storage 2024
Concentric Power Gonzales Manufacturing Facility - Taylor Farms Gonzales 2016 2016 Commercial Yes Continuous 4,800.0 0.0 CHP, Solar, Wind 2024
Karuk Tribe Community Scale Solar Energy Generating Systems Project Happy Camp 2023 2023 City / Community Yes Conditional 310.0 0.0 Solar, Storage 2024
Bloom Energy Telecom Facility Microgrid Hayward 2016 2016 Commercial Yes Continuous 1,000.0 0.0 Fuel Cell 2024
Direct Relief Alliance Medical Center Healdsburg 2024 2024 Hospital / Healthcare Yes Conditional 58.0 330.0 Solar, Storage 2024
Alpha Omega Winery Alpha Omega Winery Helena 2016 2016 Commercial Yes Conditional 400.0 100.0 Solar, Storage 2021
San Benito Health Foundation San Benito Health Center Hollister 2019 2019 Hospital / Healthcare Yes Conditional 87.0 250.0 Solar, Storage 2021
Bloom Energy Healthcare Facility Microgrid Inglewood 2015 2015 Hospital / Healthcare Yes Continuous 250.0 0.0 Fuel Cell 2024
Bloom Energy Healthcare Facility Microgrid Irvine 2015 2015 Hospital / Healthcare Yes Continuous 500.0 0.0 Fuel Cell 2024
Bloom Energy Data Center Microgrid Irvine 2015 2015 Commercial Yes Continuous 500.0 0.0 Fuel Cell 2024
Bloom Energy Medical Facility Microgrid Irvine 2024 2024 Hospital / Healthcare Yes Continuous 7,800.0 0.0 Fuel Cell 2024
University of California-Irvine University of California Irvine (UCI) Microgrid Irvine 2012 2012 College / University Yes Continuous 23,913.0 2,000.0 CHP, Fuel Cell, Solar, Storage 2024
Redwood Gate Ranch Redwood Gate Ranch Jenner 2014 2014 Commercial No Continuous 40.8 0.0 Diesel, Solar, Storage 2024
U.S. Military Fort Hunter Liggett Jolon 2024 2024 Military Yes Conditional 6,750.0 2,500.0 Solar, Storage 2024
Aemetis Aemetis Ethanol Plant Microgrid Keyes 2024 2024 Commercial Yes Conditional 2,000.0 1,250.0 Solar, Storage 2024
Staar Surgical Staar Surgical Microgrid Lake Forest 2024 2024 Commercial Yes Conditional 780.0 450.0 Solar, Storage 2024
Sharp Grossmont Hospital Sharp Grossmont Hospital La Mesa 2013 2013 Hospital / Healthcare Yes Continuous 4,400.0 0.0 CHP 2021
Bloom Energy Semiconductor Facility Microgrid Livermore 2021 2021 Commercial Yes Continuous 1,400.0 0.0 Fuel Cell 2024
Bear River Band of the Rohnerville Rancheria Rohnerville Rancheria Renewable Hybrid Microgrid Loleta 2015 2015 City / Community Yes Conditional 104.8 30.0 Solar, Storage, Wind 2024
Loma Linda University Hospital Loma Linda University Hospital Loma Linda 1989 2018 Hospital / Healthcare Yes Continuous 1,000.0 0.0 CHP 2021
U.S. Military JFTB Joint Forces Training Base Los Alamitos Los Alamitos 2023 2023 Military Yes Conditional 34,500.0 20,000.0 Diesel, Solar, Storage 2024
University of California-Los Angeles UCLA South Campus Cogeneration Plant Los Angeles 1994 1994 College / University Yes Continuous 43,000.0 0.0 CHP 2021
Bloom Energy Office Building Microgrid Los Angeles 2021 2021 Commercial Yes Continuous 1,000.0 0.0 Fuel Cell 2024
Port of Los Angeles Green Omni Terminal Demonstration Project, Port of Los Angeles Los Angeles 2018 2018 Commercial Yes Conditional 1,000.0 2,600.0 Solar, Storage 2020
Bloom Energy Grocery Store Microgrid Los Angeles 2013 2013 Commercial Yes Continuous 250.0 0.0 Fuel Cell 2024
Amond World / Origo Investments Amond World Cold Storage Facility Madera 2023 2023 Commercial No Continuous 3,600.0 1,200.0 Natural Gas, Solar, Storage 2024
McKinleyville Community Services District McKinleyville CSD da’ledik Microgrid Hiller Park Wastewater Treatment Plant McKinleyville 2023 2023 Water Treatment / Utility Yes Conditional 1,000.0 250.0 Diesel, Solar, Storage 2023
Redwood Coast Energy Authority California Redwood Coast - Humboldt County Airport McKinleyville 2022 2022 Airport Yes Conditional 2,200.0 2,200.0 Solar, Storage 2023
KB Home Shadow Mountain Community Microgrid Menifee 2023 2023 City / Community Yes Conditional 0.0 2,000.0 Solar, Storage 2024
Bloom Energy Manufacturing Facility Microgrid Milpitas 2017 2017 Commercial Yes Continuous 1,025.0 0.0 Fuel Cell 2024
Saddleback Community College Saddleback Community College Microgrid Missio Viejo 2013 2013 College / University Yes Continuous 1,500.0 0.0 CHP 2020
Southern California Edison Co Southern California Edison Gem Dam Microgrid Mono County 2019 2019 Other Yes Conditional 6.6 0.0 Natural Gas, Solar, Storage 2020
SoCalGas SoCalGas Monterey Park Facilty Monterey Park 2020 2020 Commercial Yes Continuous 500.0 0.0 Fuel Cell 2024
Bloom Energy Transportation Facility Microgrid Napa 2021 2021 Commercial Yes Continuous 300.0 0.0 Fuel Cell 2024
Chemehuevi Valley Reservation Chemehuevi Community Center Microgrid Needles 2018 2018 City / Community Yes Conditional 90.4 25.0 Solar, Storage 2024
Boxpower Agriculture Nevada City 2019 2019 Agriculture No Conditional 5.5 0.0 Solar, Storage 2020
Lions Club Camp Ross Relles Nevada City 2019 2019 Other No Conditional 35.0 0.0 Natural Gas, Solar, Storage 2020
Hoag Memorial Hospital Hoag Memorial Hospital Newport Beach 2005 2014 Hospital / Healthcare Yes Continuous 7,500.0 0.0 CHP 2021
Pacific Aquafarms Pacific Aquafarms Niland Agriculture No Conditional 125.0 120.0 Solar, Storage 2021
The Thacher School The Thacher School Ojai 2017 2017 Schools Yes Conditional 750.0 250.0 Solar, Storage 2021
Kaiser Permanente Kaiser Permanente Ontario Ontario 2023 2023 Hospital / Healthcare Yes Continuous 9,000.0 0.0 Diesel, Fuel Cell, Solar, Storage 2023
The California Energy Commission / U.S. Department of Energy Palmdale Water District Microgrid Palmdale 2006 2006 Public Institution Yes Continuous 3,200.0 450.0 Diesel, Hydro, Natural Gas, Storage, Wind 2024
Adventist Health Feather River Health Center Paradise 2021 2021 Hospital / Healthcare Yes Continuous 675.0 0.0 Solar, Storage 2021
Bloom Energy University Microgrid Pasadena 2020 2020 College / University Yes Continuous 1,200.0 0.0 Fuel Cell 2024
Bloom Energy Department Store Microgrid Pasadena 2020 2020 Commercial Yes Continuous 200.0 0.0 Fuel Cell 2024
SoCalGas SoCalGas Pico Rivera Facility Pico Rivera 2020 2020 Commercial Yes Continuous 400.0 0.0 Fuel Cell 2024
Bloom Energy Lab Microgrid Pleasanton 2020 2020 Commercial Yes Continuous 1,000.0 0.0 Fuel Cell 2024
U.S. Military Navy MUSE Microgrid at Port Hueneme Port Hueneme 2015 2015 Military Yes Conditional 150.0 100.0 Solar, Storage 2022
San Diego Gas & Electric Ramona Air Attack Base Ramona 2022 2022 Military Yes Conditional 0.0 500.0 Storage 2022
Eisenhower Medical Center Eisenhower Medical Center Rancho Mirrage 2002 2002 Hospital / Healthcare Yes Continuous 5,000.0 0.0 CHP 2021
The Grove of Redlands Grove Event Center Redlands Commercial Yes Conditional 24.0 0.0 Solar 2023
Bloom Energy Distribution Center Microgrid Rialto 2023 2023 Commercial Yes Continuous 900.0 0.0 Fuel Cell 2024
Bloom Energy Department Store Microgrid Richmond 2020 2020 Commercial Yes Continuous 200.0 0.0 Fuel Cell 2024
Kaiser Permanente Richmond Medical Center Microgrid Richmond 2018 2018 Hospital / Healthcare Yes Conditional 400.0 250.0 CHP, Solar, Storage 2024
California Office of Emergency Services / Bloom Energy Sleep Train Arena Sacramento 2020 2020 Hospital / Healthcare Yes Continuous 400.0 0.0 Fuel Cell 2024
Sacramento Municipal Utility District SMUD Sacramento Headquarters Microgrid DER Test Facility Sacramento 2012 2012 Research Facility Yes Conditional 310.0 0.0 CHP, Solar 2024
University of California-Davis UC Davis Medical Center Sacramento 1998 1998 Hospital / Healthcare Yes Continuous 28,000.0 0.0 CHP 2021
Sacramento Municipal Utility District (SMUD) 2500 R Midtown Sacramento 2013 2013 City / Community Yes Conditional 76.5 204.0 Solar, Storage 2021
Santa Rita Union School District La Joya Elementary School Salinas 2018 2018 Schools Yes Conditional 115.0 30.0 Solar, Storage 2020
Santa Rita Union School District Bolsa Knolls Middle School Salinas 2018 2018 Schools Yes Conditional 264.0 90.0 Solar, Storage 2020
Santa Rita Union School District New Republic Elementary School Salinas 2018 2018 Schools Yes Conditional 156.0 90.0 Solar, Storage 2020
Santa Rita Union School District McKinnon Elementary School Salinas 2018 2018 Schools Yes Conditional 143.0 60.0 Solar, Storage 2020
Santa Rita Union School District Gavilan View Middle School Salinas 2018 2018 Schools Yes Conditional 207.0 120.0 Solar, Storage 2020
Santa Rita Union School District Santa Rita Elementary School Salinas 2018 2018 Schools Yes Conditional 167.0 90.0 Solar, Storage 2020
St. Bernardine Medical Center St. Bernardine Medical Center San Bernardino 2007 2007 Hospital / Healthcare Yes Continuous 1,960.0 0.0 CHP 2021
Bloom Energy Distribution Center Microgrid San Bernardino 2014 2014 Commercial Yes Continuous 1,000.0 0.0 Fuel Cell 2024
U.S. Military U.S. Navy San Clemente Island Microgrid San Clemente 2002 2002 Military No Continuous 3,325.0 0.0 Diesel, Solar, Wind 2024
San Diego Zoo San Diego Zoo Solar-to-EV Project San Diego 2012 2012 Other Yes Conditional 900.0 100.0 Solar, Storage 2021
Veteran’s Affairs San Diego Healthcare System (VASDHS) San Diego VA Hospital San Diego 2005 2005 Hospital / Healthcare Yes Continuous 4,600.0 0.0 CHP 2021
Port of San Diego Tenth Avenue Marine Terminal Microgrid San Diego 2024 2024 Commercial Yes Conditional 750.0 700.0 Solar, Storage 2024
EDF Renewables EDF Renewables North America HQ San Diego 2020 2020 Commercial Yes Conditional 389.0 280.0 Solar, Storage 2020
U.S. Marine Corps Marine Corps Air Station Miramar San Diego 2021 2020 Military Yes Continuous 11,500.0 250.0 CHP, Diesel, Natural Gas, Solar, Storage 2023
University of California-San Diego UC San Diego Microgrid San Diego 2013 2013 College / University Yes Continuous 35,200.0 2,560.0 CHP, Fuel Cell, Solar, Storage 2024
San Diego International Airport San Diego International Airport Microgrid San Diego 2019 2019 Airport Yes Conditional 5,500.0 2,000.0 Solar, Storage 2023
San Diego State University San Diego State University San Diego 2002 2002 College / University Yes Continuous 15,400.0 0.0 CHP, Solar 2021
Sudberry Properties Civita Smart Grid Community, Mission Valley San Diego 2014 2014 City / Community Yes Continuous 175.0 100.0 CHP, Solar, Storage 2024
University of San Francisco University of San Francisco San Francisco 1988 1988 College / University Yes Continuous 1,500.0 0.0 CHP 2021
Bloom Energy Office Building Microgrid San Francisco 2021 2021 Commercial Yes Continuous 500.0 0.0 Fuel Cell 2024
Morgan Stanley One Maritime Plaza - Advanced Microgrid Solutions (AMS) San Francisco 2018 2018 Commercial Yes Conditional 0.0 500.0 Storage 2023
National Park Service Alcatraz Island, San Francisco San Francisco 2012 2012 Public Institution Yes Conditional 305.0 400.0 Solar, Storage 2023
UCSF UCSF Parnassus San Francisco 1997 2018 Hospital / Healthcare Yes Continuous 20,000.0 0.0 CHP, Diesel, Solar 2021
Soboba Band of Luiseno Indians Soboba Band of Luiseno Indians Fire Station Microgrid San Jacinto 2024.0 2024 Public Institution Yes Conditional 50.0 0.0 Solar, Storage 2024
Bloom Energy Data Center Microgrid San Jose 2015 2015 Commercial Yes Continuous 1,000.0 0.0 Fuel Cell 2024
Bloom Energy Extreme Networks Headquarters San Jose 2019 2019 Commercial Yes Continuous 1,000.0 0.0 Fuel Cell 2024
PG&E Yerba Buena Microgrid at HGST R&D facility, San Jose (near PG&E’s Swift Substation) San Jose 2013 2013 Research Facility Yes Conditional 0.0 4,000.0 Storage 2024
Bloom Energy Lab Microgrid San Jose 2019 2019 Commercial Yes Continuous 1,200.0 0.0 Fuel Cell 2024
Bloom Energy Office Building Microgrid San Jose 2016 2016 Commercial Yes Continuous 1,000.0 0.0 Fuel Cell 2024
Bloom Energy Office Building Microgrid San Jose 2020 2020 Commercial Yes Continuous 600.0 0.0 Fuel Cell 2024
Unison Energy/ Whole Foods Whole Foods San Jose San Jose 2015 2015 Commercial Yes Continuous 320.0 0.0 CHP 2023
Concentric Power Church Brothers Farms - True Leaf Farms San Juan Bautista 2017 2017 Agriculture Yes Continuous 2,000.0 0.0 CHP 2020
U.S. Military San Nicolas Island Naval Facility, Ventura Naval Base San Nicolas Island 2013 2013 Military No Continuous 4,200.0 500.0 Diesel, Storage, Wind 2022
Direct Relief Direct Relief Warehouse - CA Santa Barbara 2019 2019 Hospital / Healthcare No Conditional 932.0 676.0 Diesel, Natural Gas, Solar, Storage 2023
ENGIE / Santa Barbara Unified School District Santa Barbara Unified School District Microgrid Santa Barbara 2022 2022 Schools Yes Conditional 4,200.0 0.0 Solar, Storage 2023
Bloom Energy Office Building Microgrid Santa Clara 2014 2014 Commercial Yes Continuous 1,000.0 0.0 Fuel Cell 2024
Santa Clara University Santa Clara University Microgrid, Santa Clara Santa Clara 2011 2011 College / University Yes Continuous 9,150.0 0.0 Biogas, Diesel, Solar
Santa Clara County Santa Clara County Emergency Shelter Microgrid Santa Clara 2020 2020 City / Community No Conditional 79.0 0.0 Natural Gas, Solar, Storage 2023
Bloom Energy University Microgrid Santa Clara 2018 2018 College / University Yes Continuous 1,500.0 0.0 Fuel Cell 2024
Sandbar Solar Sandbar Solar Santa Cruz 2019 2019 Commercial No Continuous 119.0 60.0 Natural Gas, Solar, Storage 2021
SolMicroGrid Chick-fil-A Microgrid, Santa Rosa Santa Rosa 2024 2024 Commercial Yes Continuous 300.0 0.0 Natural Gas, Solar, Storage 2024
City of Santa Rosa Laguna Wastewater Treatment Plant Microgrid, Santa Rosa Santa Rosa 2018 2018 Water Treatment / Utility Yes Continuous 2,326.0 2,000.0 CHP, Solar, Storage 2024
Bloom Energy Office Building Microgrid Santa Rosa 2018 2018 Commercial Yes Continuous 4,300.0 0.0 Fuel Cell 2024
Pepperwood Preserve and Sonoma Clean Power Pepperwood Preserve’s Bechtel House Santa Rosa 2023 2023 Commercial No Conditional 17.4 0.0 Solar, Storage 2023
Bloom Energy Telecom Facility Microgrid Sherman Oaks 2019 2019 Commercial Yes Continuous 1,000.0 0.0 Fuel Cell 2024
Stone Edge Farm Stone Edge Farm Estate Vineyards, Sonoma Sonoma 2012 2016 Commercial No Continuous 461.0 324.0 Fuel Cell, Natural Gas, Solar, Storage 2021
Sonoma Valley Unified School District Sonoma Valley Unified School District Bus Yard Sonoma 2020 2020 Schools Yes Conditional 200.0 710.0 Solar, Storage 2021
SolMicroGrid Chick-fil-A Microgrid, Stockton Stockton 2022 2022 Commercial Yes Continuous 300.0 0.0 Natural Gas, Solar, Storage 2024
Bloom Energy Office Building Microgrid Sunnyvale 2015 2015 Commercial Yes Continuous 250.0 0.0 Fuel Cell 2024
Bloom Energy Office Building Microgrid Sunnyvale 2014 2014 Commercial Yes Continuous 250.0 0.0 Fuel Cell 2024
JSR Micro Inc. JSR Micro Microgrid Sunnyvale 2019 2019 Commercial Yes Continuous 1,100.0 0.0 Fuel Cell 2024
Liberty Utilities Sagehen Microgrid Truckee 2020 2020 Research Facility Yes Conditional 55.0 0.0 Natural Gas, Solar, Storage 2020
U.S. Military Twenty-nine Palms Marine Corps Air Ground Combat Center, Twenty-nine Palms Twentynine Palms 2020 2020 Military Yes Continuous 26,000.0 0.0 CHP, Solar 2024
Mendocino Community Health Clinic Medocino Community Health Clinic Ukiah 2020 2020 Hospital / Healthcare Yes Conditional 262.0 0.0 Solar, Storage 2020
Boxpower Agriculture Ukiah 2020 2020 Agriculture No Conditional 38.0 0.0 Natural Gas, Solar, Storage 2020
Bloom Energy Food & Beverage Facility Microgrid Union City 2022 2022 Commercial Yes Continuous 2,000.0 0.0 Fuel Cell 2024
Bloom Energy Grocery Store Microgrid Vacaville 2020 2020 Commercial Yes Continuous 250.0 0.0 Fuel Cell 2024
San Pasqual Band of Mission Indians San Pasqual Band of Mission Indians Microgrid Valley Center 2021 2021 City / Community Yes Conditional 228.0 150.0 Solar, Storage 2023
U.S. Military Vandenberg Air Force Base Vandenberg AFB 2011 2011 Military Yes Continuous 15,250.0 0.0 Diesel 2022
Bloom Energy Telecom Facility Microgrid West Sacramento 2016 2016 Commercial Yes Continuous 400.0 0.0 Fuel Cell 2024
Bloom Energy Grocery Store Microgrid Woodland 2020 2020 Commercial Yes Continuous 250.0 0.0 Fuel Cell 2024
Bloom Energy Grocery Store Microgrid Woodland 2020 2020 Commercial Yes Continuous 250.0 0.0 Fuel Cell 2024
  • Microgrids in this database include systems serving electricity to multiple buildings and/or consisting of more than one distributed energy resource. Microgrids must operate either continuously or conditionally during normal operating conditions.
  • Microgrids that operate continuously supply power to the host site on a regular basis, both in grid-connected and island mode, and can be relied upon for uninterrupted power during extended grid outages.
  • Microgrids that operate conditionally do not supply power to the host site on a continuous basis while grid connected. Instead, power supply to the site is based on the availability of renewable resources or market signals such as demand response or real-time pricing.
  • All microgrids in this database must be capable of supplying continuous power to site loads when disconnected from the larger grid.

State Summary for California

Technology Sites* Capacity (KW)
Total 164 576,024.91
Biogas 1 1,000
CHP 31 226,460
Diesel 20 71,330
Fuel Cell 54 51,128
Hydro 1 250
Natural Gas 15 6,202
Solar 93 141,250.41
Storage 91 73,126.2
Wind 8 5,278.3

* Most microgrids contain multiple technologies, so site totals by technology may be greater than the total number of microgrid sites in the state.

Application Descriptions

Application Definition
Agriculture Farms that grow and process foods or other products
AirportCommerical airports
City/CommunityMultiple customers in a community or municipal setting
College/UniversityCollege and university campuses
CommercialCommercial buildings not otherwise classified
Hospital/HealthcareBuildings and campuses providing health care or assisted living services
MilitaryU.S. military bases and facilities
Multi-FamilyApartment buildings, public housing facilities, and housing cooperatives
Public InstitutionFederal/state/municipal buildings that serve a public function
Research FacilityResearch and development facilities and laboratories
SchoolsK-12 schools
Water Utility/TreatmentFacilities that provide direct treatement of water
OtherSites that do not fall into listed categories

Column Heading Descriptions

Heading Description
Organization Name Name of the owner or operator of the microgrid
Project Name Name of the microgrid system
City City name
Op Year Year the microgrid first became operational (years of all system expansions are not shown)
Latest Install Year Year of the most recent installation in the microgrid system
Primary Application Primary market sector of the end-user(s) served by the microgrid
Grid Connected Is the microgrid connected to a larger grid?
Microgrid Type Continuous or conditional operation
Generation Capacity (kW) Total electric capacity of all operational generating technologies in the microgrid (kilowatts)
Storage Capacity (kW) Total electric capacity of all battery storage units in the microgrid (kilowatts)
Technologies List of all operational technologies that make up the microgrid
Last Verified The year of the most recent verification of data for this microgrid

Technology Descriptions

Code Description
CHP Combined heat and power installation
Biogas Non-CHP biogas-fueled generator(s)
Diesel Non-CHP diesel-fueled generator(s)
Fuel Cell Non-CHP fuel cell system
Hydro Hydroelectric power facility
Natural Gas Non-CHP natural gas-fueled generator(s)
Solar Photovoltaic (PV) solar panels
Storage Energy storage technologies
Wind Wind turbines
Advanced Controls* Advanced microgrid controls system

* Advanced microgrid control systems enable automated communication and decision-making between the microgrid and the larger grid and between DERs within the microgrid.

*Note: while this system is waste heat to power it may not meet PURPA's definition of cogeneration (aka CHP).